Disturbed Simulations
16
3.13 MB
Added to lista życzeń dla LS25
BGA network distributer
Maximise your returns from the outputs of your BGA through improved distribution into the power grid and more comprehensive purification of methane.
This is reflected in improved payouts (double standard rates) but distribution takes longer to complete.
Two versions are included
Normal: £75,000
Capacity:
Electric Charge: 20,000KW
Methane: 20,000L
Process speed:
Electric Charge: 120,000KW / month
Methane: 60,000L / month
Cheaty Version: £150,000
Capacity:
Electric Charge: 80,000KW
Methane: 80,000L
Process speed:
Electric Charge: 480,000KW / month
Gas: 240,000L / month