Build the Biogas plant of your dreams, like you ever wanted it. 22 different modules to fit your needs (and let you earn money ;) ).
Each module fully functional. Only your imagination, how effectively the plant produces electricity, methane and digestate from all sorts of biomass, is the limit.
The modular BGP needs basically only 2 modules to function!
On the one hand the bunker (filling of biomass) and on the other hand the fermenter (processing of biomass). Both modules are always! necessary.
A special feature are the bunkers with included biogrinder. This extended bunker gives you the possibility to fill it directly with sugar beets, eliminating the step of beet chopping and thus representing the first possible optimization.
With these two components, you can already operate a fully functional plant.
The production menu offers full control of how the plant should work. In any case, the bunker must always be set to distribute in order to pass on the biomass you have filled in to the fermenter.
The heart of every modular biogas plant. The Fermenter.
If it has received the biomass and you have the respective production active, it will convert, depending upon built size, biomass into methane, electricity and fermentation residues.
At this point, you could already set whether the products should be sold. This would complete the production cycle and generate money.
You want to get more out of your BGA, then simply expand it.
Instead of only processing and selling your biomass via the bunker and fermenter, use the opportunity to increase the yield or optimize the plant by adding more modules.
If you place the manure station, you can also supply the fermenter with manure. If you want to process larger quantities of liquid manure, the best possibility is to use the liquid digester, which als can be filled directly.
This one can only process liquid manure, but the ratio of the processed manure is higher then the normal processing.
If you do not want to sell your digestate, use the digestate storage station. This collects the fermentation residues from all modules that are distributed and stores them centrally.
Secondary fermenters have the task of processing the products from the fermenter(s) and thus provide you with a bonus. If you use several secondary fermenters, you increase this bonus, but the processing speed is halved.
If you want to get the most out of methane and electricity when selling, use the generators or the methane sales tank. These ones sell your goods with a factor of 2 and 1.5 respectively.
All modules exchange goods with each other when distribution is active. It is up to you how or what should be distributed, kept or sold.
Changelog V1.2.0.0
-modDesc version updated
-internal filltypes added to prevent doubling material and an almost neverending workflow
-extended production lines for a more complex and better production workflow
-decreased output (community suggestion) for better economy
-internal distribution system revised
-separate huds for internal fill types added
-input/output products revised
-work cycle adjusted, profit reduced (no more money printing machine)
-two new objects (for targeted distribution of electricity and methane, for productions if needed)
-unnecessary mission target points removed
Attention! The modular BGP must be placed with this update mandatory new! BEFORE the update, the old BGP must be removed! (Savegame)
Module overview
Bunker (Requires fermenter)
Bunker Small:
Price: 56000 $
Capacity
- Silage: 20000L
- Manure: 10000L
- Beet pulp: 10000L
Maintenance: 20 $
Bunker middle:
Price: 73500 $
Capacity
- Silage: 60000L
- Manure: 20000L
- Beet pulp: 20000L
Maintenance:30 $
Bunker medium BG:
Price: 89500 $
Capacity
- Silage: 60000L
- Manure: 20000L
- Beet pulp: 20000L
- Beet: 30000L
Maintenance: 40 $
Bunker Large:
Price: 125000 $
Capacity
- Silage: 80000L
- Manure: 35000L
- Beet pulp: 25000L
Maintenance: 50 $
Bunker large BG:
Price: 152500 $
Capacity
- Silage: 80000L
- Manure: 35000L
- Beet pulp: 25000L
- Beet: 35000L
Maintenance: 60 $
Bunkers overload once an hour their complete content to the digester. Except for beets, which are first chopped according to the cycle and then passed on, otherwise use bunkers with BG (BioGrinder) marking.
Fermenter (Requires bunker, slurry can be added via slurry storage)
Digester 100:
Price: 85000 $
Capacity
In:
- Silage: 100000L
- Manure: 100000L
- Beet pulp: 100000L
- Slurry: 100000L
Out:
- Electricity: 10000L
- Methane: 10000L
- Fermentation residues: 10000L
Maintenance: 20 $
Fermenter 150:
Price: 127500 $
Capacity
In
- Silage: 150000L
- Manure: 150000L
- Beet pulp: 150000L
- Manure: 150000L
Out
- Electricity: 15000L
-Methane: 15000L
- Fermentation residues: 15000L
Maintenance: 40 $
Digester 200 / corner digester:
Price: 170000 $
Capacity
In
- Silage: 200000L
- Manure: 200000L
- Beet pulp: 200000L
- Slurry: 200000L
Out
- Electricity: 20000L
- Methane: 20000L
- Fermentation residues: 20000L
Maintenance: 50 $
Fermenter 300:
Price: 255000 $
Capacity
In
- Silage: 300000L
- Manure: 300000L
- Beet pulp: 300000L
- Slurry: 300000L
Out
- Electricity: 30000L
- Methane: 30000L
- Fermentation residues: 30000L
Maintenance: 70 $
Secondary fermenter (Requires digester or digestate storage)
Secondary fermenter large 1:
Price: 170000 $
Capacity
In
- Digestate: 300000L
Out
- Electricity: 50000L
- Methane: 50000L
Maintenance: 40 $
Secondary fermenter large 2:
Price: 150000 $
Capacity
In
- Fermentation residues: 200000L
Out
- Electricity: 40000L
- Methane: 40000L
Maintenance: 35 $
Secondary fermenter means:
Price: 120000 $
Capacity
In
- Electricity: 20000L
- Methane: 20000L
Out
- Fermentation residues: 140000L
Maintenance: 25 $
Secondary fermenter Small:
Price: 105000 $
Capacity
In
- Electricity: 10000L
- Methane: 10000L
Out
- Fermentation residues: 80000L
Maintenance: 20 $
Liquid fermenter (Can be filled directly or through slurry storage)
Liquid digester large:
Price: 240000 $
Capacity
In
- Slurry: 100000L
Out
- Electricity: 50000L
- Methane: 50000L
- Fermentation residues: 100000L
Maintenance: 40 $
Liquid fermenter Small:
Price: 120000 $
Capacity
In
- Slurry: 60000L
Out
- Electricity: 10000L
- Methane: 10000L
- Fermentation residues: 60000L
Maintenance: 30 $
Liquid storage
Liquid manure storage
Price: 56000 $
Capacity
- Slurry: 2000000L
Maintenance: 10 $
Distributes manure to digesters and liquid digesters in small quantities
Digestate storage:
Price: 56000 $
Capacity
- Fermentation residues: 2000000L
Maintenance: 10 $
Collects digestate from digester or secondary digester
Sale (Sell your goods with factor 2 or 1,5)
Generator1:
Price: 85000 $
Capacity
Electricity: 10000L (selling factor 2x)
Methane: 10000L (selling factor 1.5x)
Maintenance: 10 $
Generator2:
Price: 65000 $
Capacity
Electricity: 10000L (sale factor 1.5x)
Maintenance: 5 $
Methane sale:
Price: 85000 $
Methane: 10000L (Sale factor 2x)
Maintenance: 5 $
NEW Buildings
Electricity distributor:
Price: 85000 $
Capacity
In
-Factory power: 10000
Out
-Electricity: 100000
Maintenance: 5 $
Collects factory power from the digester or second digester for use in other productions as electricity.
Charging electric powered vehicles possible.
Gas distributor
Price: 85000 $
Capacity
In
-Storable methane: 10000
Out
-Methane: 100000
Maintenance: 5 $
Collects storable methane. Can be taken out as methane for use wherever it's needed. (Trailer with methane filltype needed for transport)
Info:
For the placement, it is highly recommended to use the "Free Build" mode. (standard key V)
Bunkers can also be placed at the standard BGP and fill it.
Fermentation residue storage can also collect fermentation residues from standard BGA, if placed there on distribute.
Keep in mind that when the production is set to distribute, the goods will also be delivered to all productions running alongside the BGP that accept this products.
Last but not least, keep the production limit of 60 total productions in mind. If you need more, use the production limit increaser mod by modelleicher (only PC), available at the .