Mr_Fluffkin
47
129.32 KB
Added to wishlist for FS25
Autodrive route network for HAUT-BEYLERON
Version 2.0 Final
Version 1.5
BGA wedge silos retracted = 1 bunker with 4 lanes each
Version 1.2
Some unloading / loading points added to the BGA
Missing route network completed
All fields [except field 25 / 31]
Some outlets and unloading point.